- Home
- Sergio Grasso Srl
Sergio Grasso Srl
Marble and other stones - machining Acireale
Company - Sergio Grasso Srl
Sergio Grasso Srl - company that deals with the processing of stone, marble and granite.
Address : Via Antillo, 15, 95024 Acireale CT, Italy
ZIP Code : 95024
Acireale
Phone : +390957645049
ZIP Code : 95024
Acireale
Contacts
Categories
- Construction Companies (2,543)
- Electrical Installations (1,067)
- Electricians (614)
- Doors, Windows and Gates (586)
- Property Management (585)
- Construction - Materials (570)
- Painting and Decorating (402)
- Locksmiths (307)
- Construction Equipment (266)
- Plumbers (259)
- Flooring (214)
- Construction, Doors, Sanitary Ware and Plumbing - Agents and Representatives (213)
- Air conditioning systems - Installation (169)
- Safety Devices and Alarms (132)
- Demolition and Excavation (126)
- Floor Sanding and Refinishing (120)
- Thermal and Acoustic Insulation - Installation (113)
- Engineering Firms (112)
- Artistic Ceramics (108)
- Fire Protection - Systems and Equipment (107)
- Metal Windows and Doors (105)
- Elevators - Installation, Repair and Maintenance (96)
- Roofing Contractors (90)
- Waterproofing Contractors (80)
- Building Maintenance (78)
- Lighting - Systems and Materials (78)
- Scaffolding Contractors (76)
- Ceramics for floor and wall tiles - Retail (72)
- Paints, Enamels and Varnishes - Sales (65)
- Wall and Floor Tiles (62)
- Industrial Technical Maintenance (60)
- Ceilings and Suspended Ceilings (56)
- Marble and Stone - Sales (56)
- Porphyry and Stone for Walls and Floors (55)
- Workplace Safety - Products and Equipment (55)
- Electrical Installations for Buildings and Industry - Production (53)
- Prefabricated Houses and Bungalows (49)
- Solar Control Window Film (47)
- Earth Moving Machinery (44)
- Glass, Crystal and Mirrors - Processing (44)
- Glaziers (44)
- Industrial Flooring (43)
- Building Sheet Metal - Products (41)
- Electricity - Power Generation Companies (39)
- Extinguishers - Trade (38)
- Architectural Models and Mock-ups (34)
- Marble and Mosaics for Walls and Floors (33)
- Prefabricated Construction (33)
- Rolling Shutters and Security Grilles (32)
- Coatings (30)
- Building Facade Sandblasting (28)
- Flues and Chimneys (28)
- Roads - Maintenance and Construction (28)
- Concrete and Cement - Manufacture (27)
- Security Locks (27)
- Construction Waterproof Covers (26)
- Air conditioning systems - Production and Trade (25)
- Floor Rubber, Plastic and Linoleum (25)
- Parking - Equipment and Systems (24)
- Shutters (24)
- Tents and Halls (24)
- Acoustic and Thermal Insulation - Trade (23)
- Maritime Works and Divers (23)
- Tools Surveying & Engineering (23)
- Coatings for Construction (22)
- Stairs (22)
- Ceramics for Floor and Wall Tiles - Production (21)
- Foundations, Consolidations and Palificazioni (21)
- Padlocks, Keys and Locks (21)
- Cranes - Construction and Commerce (20)
- Plasters - Production (20)
- Wall Coverings (19)
- Marble, Granite and Stones - Machinery (18)
- Painting Contractors (18)
- Surveys and Drilling Services (18)
- Construction and Road Machinery - Sales, Repair and Rental (17)
- Decorative stucco (17)
- Drilling and Surveys - Equipment and Machines (16)
- Lifts - Construction (16)
- Acoustic and Thermal Insulation - Production (15)
- Metal scaffolding and Stage for Events (15)
- Doors Tipper and Rocker (14)
- Readymix Concrete (14)
- Blinds and shutters (13)
- Corporate Signage, Safety and Shipbuilding (13)
- Sand, Gravel and Crushed Stone (13)
- Excavators and dredgers (12)
- Industrial Flexible Doors (12)
- Venetian and Vertical Blinds (12)
- Chalk (11)
- Waterproofing for Roads and Construction (11)
- Fences (10)
- Insulating and Protective Coating (10)
- Construction Machinery and Road - Production (9)
- Extinguishers - Production (9)
- Paints, Varnishes and Colours - Production (9)
- Plasterers (9)
- Drinking Water - Society of Exercise (8)
- Precast Concrete (8)
- Tower Crane for Construction (8)
- Crystals and Glasses Safety and Tempered (7)
- Glass manufacturing - Supplies and Machinery (7)
- Mines and Quarries (7)
- Painting - Plant and Machinery (7)
- Refractory (7)
- Panels - Sales and Manufacturing (6)
- Pipes and tubes - Production and Trade (6)
- Skylights (6)
- Sliding Doors and Folding (6)
- Cement (5)
- Ceramics and Refractories - Machinery, Equipment and Materials (5)
- Crushing and grinding - Machinery (5)
- Handles (5)
- Sound-absorbing panels (5)
- Granites (4)
- Insulating Windows (4)
- Prefabricated Box (4)
- Semaforica signage - Systems (4)
- Technical and Industrial Ceramics (4)
- Concrete - Pumps and Central (3)
- Door Entry Systems, Video Door Phones and Intercoms (3)
- Dormer windows - Manufacture (3)
- Gabions for hydrogeological (3)
- Grilles and grates (3)
- Guardrails (3)
- Lime (3)
- Monuments Funeral (3)
- Sandblasting, Shot Peening and Shot Blasting Machines (3)
- Bricks (2)
- Bricks - Machinery and Systems (2)
- Clays (2)
- Concrete Mixers and Truck Mixers (2)
- Geotextiles and geosynthetics (2)
- Linoleum (2)
- Manhole covers (2)
- Mezzanines (2)
- Slates (2)
- Stoneware (2)
- Cement pipes (1)
- Fiber cement - slabs, Manufacture and Tubes (1)
- Fountains (1)
- Groomers, snow throwers and - Machinery and Equipment (1)
- Lightning protection (1)
- Rod for reinforced concrete - Moulding and Processing (1)